HealthCare
   
VA Tampa
   

Profile-Commercial
Profile-Specialty 
   

Selected Projects

·          IAQ Bldg. 32, Phases 1 and 2, – Study and design of preconditioning coils, dehumidifiers, replacement of valves, insulation, and controls to improve indoor air quality.

·         Renovate Exhaust System – Phase 1 and 2, – As-built drawings and testing of 97 exhaust fans.  Recommendations for prioritization of fan replacement and designed the first two phases of fan replacement.

·         Overhaul Major AHU’s – Phases 5, 6, and 7, replacement of two 40,000 CFM AHUs and installation of a new surgery water chiller, cooling tower, AHU, and associated systems.

·         Rehab OPT Area, Bldg. 36 – Construct a 2,000 SF addition and 7,000 SF general renovation including new HVAC, Electrical and Fire protection systems.

·         Renovate OP – Phase II and III – Renovation of two 10,000 SF patient rooms wings into three outpatient surgery rooms with support spaces and specialty clinics.

·          Morgue Formaldehyde Exhaust System – Install  new Morgue hood and table exhaust system.

·          1-C North and West Renovations –General renovations of two patient room wings.

·         TB Safeguards – Install exhaust and filtration systems for TB isolation in 14 areas throughout the Hospital, including outpatient, radiology, imaging, NHCU, emergency and RTU areas.

·         Replacement of existing chute with new 30 inch chute, including controls, fire protection, and sanitizer with soil utility room upgrades.

·         VA Orlando Outpatient Clinic – New 400 ton chiller and hydronic system upgrades.

·         2BS/W Nurse’s Station – General renovation of nurse station.

·         Replace Emergency Generator – Phase 1 – Two new 750 KVA paralleling generators with essential system distribution.

·         Replace Sewer Lines – Ph. 1 – Replacement of sewer lines in a portion of the building.

·         Replace Linear Accelerator – Replacement of an existing linear accelerator.

·         Replace Gamma Cameras – Relocation and replacement of Gamma Cameras.

·         Replace Electrical Transfer Switch – New transfer switch scheme and equipment to form the basis of new essential electrical distribution system for the entire facility.

·         IRMS Training HVAC– Analysis and design of new HVAC system.

·         VA Brevard County OPC HVAC Study – Analysis of surgical suite HVAC system.  Design of temporary preconditioning units, exhaust fans and rebalance air systems. 

·          Chemotherapy Hood Exhaust – 1998 – New exhaust hood, fan and duct system. Install Cook Chill System – Site preparation for 17 retherm units and a blast chiller.


James A Haley VA Medical
Tampa, Florida