HealthCare
   
VA West Palm Beach
   

Profile-Commercial
Profile-Specialty
  
   

Selected Projects

·         Install Cook Chill System – Site preparation for 17 retherm units and a blast chiller.

·         Cardiac Catheterization Laboratory – Installation of new Laboratory Suite

·         Perimeter Fence – Install decorative and security fencing

·         Computer Room Expansion – 1,500 SF expansion and renovation of Data Center

·         Exterior Painting – Exterior metal preparation and painting

·         Cook Chill – Site preparation for retherm units and a blast chiller

·         Bird Relocation - Installation of bird deterrent system

·         Emergency Switchgear – Install new emergency switchgear for emergency hurricane preparedness to allow a quick connection of a 4,000kw trailer mounted emergency generator

·      Bed Stretcher – Construct storage rooms throughout the hospital.

·      Red Bag Waste – Modular building for biohazard waste storage.

·      Bus Stop – New public transportation facility.

·      Parking Lot Expansion – Construct 70 space concrete parking lot lighting and appurtenances.

·      Switchgear Modifications - Automation of main switchgear tie breaker.

·         Medical Gases Expansion – Installation of additional medical gas outlets in the Intermediate Care Ward.

·         OSHA Fall Protection – Complete upgrade of the fall protection on the roof of the Medical Center.

·         Psychiatric Ward –  Mechanical, Plumbing and Electrical Upgrade of the Psychiatric unit.

·         Exhaust Fans –  Mechanical and Electrical survey of the exhaust fans including recommendations for installation.

·         Cardiac Lab AHU – Upgrade AHU in the Cardiac Laboratory.

·         Hazardous Waste Building – Installation of prefabricated hazardous storage building and  removal and disposal of the existing hazardous waste material building.

·         Multix Top – Renovation of the X-ray room.


VA Medical Center
West Palm Beach, Florida