Specialty Facilities
   
Naval Air Station -Southern Division
   
  

Profile-Healthcare
Profile-Commercial
 

Naval Air Station
Southern Division
Keywest, Florida

EMTec provided a multi-phase, multi-year architectural Engineering services for the design, alteration, upgrade and replacement of a variety of projects since 1986.  


The Highlights of Project

·         Relocation of Airfield Markers

·         Replace PCB Transformers

·         Fire Protection Upgrades for Hangar A-936

·         Replacement of 15 KV Substation - Truman Annex

·         15 KV Systems Operating Study - Boca Chica

·         Replacement of 15 KV Oil Switches - Boca Chica

·         Replacement of 600 Ton Chiller and Upgrade Central Plant - Building 290 - Naval Intelligence Group

·         Replacement of two 600 KW Generators - Building A-419 - Old Power Plant

·         Upgrade Fire Protection Distribution System - Boca Chica

·         Upgrade Fire Protection System in Various Buildings - Boca Chica

·         Upgrade Airfield Lighting Control Systems - Boca Chica

·         As-Built Electrical Drawings - Building 1279 - Naval Intelligence Group

·         Alterations to Electrical and HVAC Systems - Bldg. A-291 - JT4A Group

·         Upgrade 450 Ton Cooling Tower - Building 1352 - Truman Annex

·         Upgrade 150 Ton Cooling Towers - Buildings A-650 and A-651 - Boca Chica

·         Study of Underground Fuel Storage and Delivery System - Navy Exchange Service Station - Building A-322

·         Design of Aboveground Fuel Storage and Delivery System - Navy Exchange Service Station - Building A-322

·         Upgrade Water Distribution System - Naval Medical Clinic

·         Upgrade Storage Tanks and Truck Fill Stands for Mogas and Diesel Fuel - Trumbo Point Fuel Depot

·         Design Spray Paint Booth and Upgrade Fire Protection System - Spray Paint Shop - NAS Public Works

·         Upgrade Physical Security - Cudjoe Key Air Force Station, Cudjoe Key, FL

·         Replacement and Relocation of Avgas Fuel Storage and Delivery System

·          Alterations to 15 KV Power Distribution System - Boca Chica

·          Alterations to A/C System - Building A-936 - Aircraft Hangar

·          Upgrade Chiller and Chilled Water Distribution - Building L-47

·         Installation of Fire Alarm/Radio Controlled Systems - 13 Buildings

·         Upgrade A/C System - Building A-1004 - Naval Communication Unit

·         New Electric Service and 100 KVA UPS System - Building A-626

·         Evaluation and Recommendations for Upgrading 200 Transformers -Boca Chica

·         Design Water Treatment Facility for 3 Boilers

·         Installation of Vehicle Lifts - Building A-990 - Aircraft Support Services

·          Air Force Expansion Upgrades

·         Design Air Force Expansion/Naval Training Facilities 100, 400 and 500 at NAS