EMTec provided a multi-phase, multi-year architectural
Engineering services for the design, alteration, upgrade and replacement of a
variety of projects since 1986.
The Highlights of Project
·
Relocation of Airfield
Markers
·
Replace PCB
Transformers
·
Fire Protection Upgrades
for Hangar A-936
·
Replacement of 15 KV
Substation - Truman Annex
·
15 KV Systems Operating
Study - Boca Chica
·
Replacement of 15 KV Oil
Switches - Boca Chica
·
Replacement of 600 Ton
Chiller and Upgrade Central Plant - Building 290 - Naval Intelligence Group
·
Replacement of two 600 KW
Generators - Building A-419 - Old Power Plant
·
Upgrade Fire Protection
Distribution System - Boca Chica
·
Upgrade Fire Protection
System in Various Buildings - Boca Chica
·
Upgrade Airfield Lighting
Control Systems - Boca Chica
·
As-Built Electrical
Drawings - Building 1279 - Naval Intelligence Group
·
Alterations to Electrical
and HVAC Systems - Bldg. A-291 - JT4A Group
·
Upgrade 450 Ton Cooling
Tower - Building 1352 - Truman Annex
·
Upgrade 150 Ton Cooling
Towers - Buildings A-650 and A-651 - Boca Chica
·
Study of Underground Fuel
Storage and Delivery System - Navy Exchange Service Station - Building A-322
·
Design of Aboveground
Fuel Storage and Delivery System - Navy Exchange Service Station - Building
A-322
·
Upgrade Water
Distribution System - Naval Medical Clinic
·
Upgrade Storage Tanks and
Truck Fill Stands for Mogas and Diesel Fuel - Trumbo Point Fuel Depot
·
Design Spray Paint Booth
and Upgrade Fire Protection System - Spray Paint Shop - NAS Public Works
·
Upgrade Physical Security
- Cudjoe Key Air Force Station, Cudjoe Key, FL
·
Replacement and
Relocation of Avgas Fuel Storage and Delivery System
·
Alterations to 15 KV
Power Distribution System - Boca Chica
·
Alterations to A/C System
- Building A-936 - Aircraft Hangar
·
Upgrade Chiller and
Chilled Water Distribution - Building L-47
·
Installation of Fire
Alarm/Radio Controlled Systems - 13 Buildings
·
Upgrade A/C System -
Building A-1004 - Naval Communication Unit
·
New Electric Service and
100 KVA UPS System - Building A-626
·
Evaluation and
Recommendations for Upgrading 200 Transformers -Boca Chica
·
Design Water Treatment
Facility for 3 Boilers
·
Installation of Vehicle
Lifts - Building A-990 - Aircraft Support
Services
·
Air Force Expansion
Upgrades
· Design Air Force Expansion/Naval Training Facilities 100, 400 and 500 at NAS