Office/Multi-use/Residential Buildings
   
Florida Grand Opera-Anderson Building
The Collection
Rohde Building
Charles E. Bennett Building
USDA Office Complex
Miami Dade Dept. of Water & Sewer Building
L.F. Peterson Building
The Park Trammell Building
Captal Lofts Building
The Santa Maria 
   The Jade Residence 
FIU Graham Center
Profile - Healthcare
Profile - Specialty
    

The scope of this project was the upgrade of the chilled water system and installation of an off-hour chiller system.  In addition, the project included the upgrade to the energy management system to provide remote monitoring and control.

The design included two different load calculations in order to assign capacity for the new chillers.  The fist calculation was based upon the existing operations conditions.  A load profile and energy consumption calculation was done and adjusted to the demand and consumption from most recent electric utility statements.  As a result, the calculation was considered to be an accurate representation of the performance of the building HVAC and energy system performance.  For the second and final calculation, the ventilation, miscellaneous equipment load, and lighting load were increased in order to select chillers according to future load conditions.

The building load was split between two main water chillers and a smaller off-hour water chiller.

The design estimates the profitable construction cost, which include the replacement of all hydronic specialties and all appurtenances.

The Park Trammell Building
Tampa, Florida